Sunday, July 28, 2019

Recap of work over the last month

We had a lift here for four weeks (minus Sundays, Tuesdays and bad weather days when we did "no work" days). During that time we tried to get to all of the high places that needed our attention such as windows, window trim, replacing/repairing roof shingles, painting cedar shakes, etc.








Here are the after pictures of the work that we did. We did not have enough time to replace damaged cedar shakes or to paint everything. It will have to wait until the next time we have a lift. Chris was also able to get some point work done on the tower foundation. Now that the lift is gone we will focus on the things we can get done from a ladder, scaffolding, or on the ground. The goal is to get as much of the outside work done before fall arrives.