Thursday, February 24, 2011

The finished bathroom

It's been a long and cold winter so work has slowed. This included the bathroom since some of the work had to be done in areas of the house that are not heated, but we have finished it and we are grateful to have a nice shower and beautiful room.
The before pictures:
(left-sink misplaced and not connected; right-tub shower area)
 

(left-ceiling; right-floor with missing boards and damaged plumbing)

 



And the after pictures:
 

 

We added a seat at the end of the tub so the person waiting for the next shower turn will have a place to sit.